Showing posts with label Mike Connors. Show all posts
Showing posts with label Mike Connors. Show all posts

Monday, August 31, 2015

The Mike Connors Void

St. Petersburg, Fl.
Opinion by: E. Eugene Webb, PhD
Coauthor of: So You Want to Blog

 With Connors gone, there is a real vacuum in experience, engineering talent, political insight and power within the Public Works area.

 If you follow this Blogger, you know I am not a particular fan of St. Petersburg Public Works Administrator Mike Connors. I worked around him for 20-plus years and I never really trusted the guy.

The abrupt decision By Connors to retire is very un-Connors like. Even though he has been under some serious pressure lately, Connors has weathered storms before. Mike is steady, resilient and not affected much by what most people think.

There are rumors of a growing tiff with the Mayor's Office, but no one will confirm them.

The fact is Connors is apparently gone. There are a lot of people in the City administration, on City Council and in the general public that are happy he is gone, but that joy may be short lived.

As I have stated before one of Connors' most interesting traits was his effort not to hire anyone any smarter than he is and that makes an internal hire or promotion very difficult.

There is a definite lack of talent.

Tom Gibson, Engineering and Capital Improvements Director, appointed as interim Public Works Administrator has neither the political savvy to handle the job nor the administrative ability, and the Water Resources Director Steve Leavitt would be a dismal choice.

Nobody could handle a batch of wayward contractors on a major project any better than Connors. That steely eyed look and very fast logical mind could outwit even the most clever of them, and they knew it. The Engineering Department is easy to bamboozle along with Inspections, but if Connors got involved things straightened up in a hurry.

With Connors gone, there is a real vacuum in experience, engineering talent, political insight and power in the Public Works area.

While Connors will not be missed for his political maneuvering, manipulation of City Council and general disregard for what the public thought of his antics, he will soon be missed for his ability to keep the Public Works Departments, Water Resources and Engineering Departments in line.

He will also be missed for his ability to work large-scale projects with the Construction Manager at Risk format as this relationship assumes someone with both technical ability and political connections from the City's side.

As you can see, while I may not have particularly liked Mike Connors, I do have a great deal of respect for his ability as a professional engineer.

If Kriseman turns this into a political hire, every one of those projects listed above will get into some form of budget or technical trouble.

Kriseman needs to set up a national search, establish an evaluation committee that includes some Public Works directors from the area like Pinellas County and Tampa.

What St. Pete does not need is a selection committee populated by the firms building the Pier, or the police station or anyone remotely connected to them, the Chamber of Commerce or the Pier selection committee.

It would also be nice if the new Public Works administrator actually used a computer and e-mail.

E-mail Doc at: mailto:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook and Twitter. See Doc's Photo Gallery at Bay Post Photos

Sunday, July 26, 2015

Mike Connors – recycled

St. Petersburg, FL
Opinion by: E. Eugene Webb, PhD
Coauthor of: So You Want to Blog
With little fanfare Mike Connors the front and center get it done guy for the Kriseman administration has been mildly demoted. Actually kind of recycled.
You can pick up the details in Kameel Stanley’s Tampa Bay Times article: Kriseman cuts back duties for administrator who oversaw recycling.
The Sanitation department and the Purchasing department have been removed from Connors’ span of control.
In response to an E-mail Ben Kirby, Kriseman Communications Director, indicated Sanitation will move to Neighborhood Services currently run by Mike Dove and Purchasing will report directly to Gary Cornwell City Administrator.
Connors has be a lightening rod most recently in both the Pier Park decision and the very noisy launch of the City’s recycling program.
It appears all of this leaves Connors still in charge of the City’s two largest construction projects, Pier Park and the new Police complex.
Best quote from the Stanley article: “In Mike’s role as a public servant and an operations manager, authenticity and humility, as well as being a good listener and communicator, are so important,” said Darden Rice. “People don’t want to feel managed. What we want are straight answers and real collaboration. Mike is used to doing things his own way, and that approach has not produced the best outcomes.”
Great observation and things are not likely to change.
Kriseman and City Council’s issues with Connors are not over. Despite the efforts of the Mayor’s office via Kevin King to assure everything is ok between the Dream Team and Connors those of us who have worked with Mike know he rarely goes quietly into the night.
For those who would have preferred Connors be fired the fact is Connors is probably the City’s best large scale project manager, and he has kept it that way through his hiring practices for years.
I don’t know who has been given the responsibility to keep watch on Connors, but if it is anybody on the Mayor’s Dream Team Mike is grinning from ear to ear.
For now Connors will have more time to focus on his three primary objectives: getting that damn Pyramid torn down and keeping the police building as austere as possible.
What’s the third objective? I’ll leave that to your imagination.
E-mail Doc at: mailto:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook and Twitter. See Doc’s Photo Gallery at Bay Post Photos

Sunday, July 19, 2015

The Pier Looks more like a prison than a tourist attraction or a park

Opinion by: E. Eugene Webb PhD
Coauthor of: So You Want Blog .

In a panic to get the Pier demolition process started, the Kriseman administration quickly canceled security protection for the Pier, and erected a mesh covered used chain link fence across the Pier approach.

The net effect is to create something on the water front that looks more like the entrance to a prison than a tourist attraction.

With no daytime security, regardless of what the City Legal department says, the Pier is now a safety risk, ripe for vandalism and who knows what else.

Elsewhere in social media, saintpetersblog, a City attorney says he doesn't think there is a liability to the City, but that will be a pretty weak explanation if someone's child or a wandering tourist is killed or injured.

The Corps of Engineers says it could be fall before all of the pieces are in place for the permits, and while it is quite likely the Corps is getting some political heat, my experience is they don't respond real well to that kind of pressure.

Some attempt to protect the public (this fence doesn't qualify) and the image of the Pier and downtown would seem to be a wise plan.

It would only make good sense for the Administration to keep things neat, clean and safe around the Pier approach since a lot of people walk down that way and a fence like that is really tempting to a lot of people.

This is yet another short sighted knee jerk reaction by an administration that is so fixated on getting their way and tearing down the Inverted Pyramid that they are exercising no reason in their decision making. Same approach will likely carry right into the design review process.

It is also interesting that the City's New Pier Web site has not been updated since July 9, 2015. That's just about the time the demolition Permits thing blew up.

So much for transparency and timely updating.

E-mail Doc at mail to:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook. See Doc's Photo Gallery at Bay Post Photos.
Disclosures:
Contributor: Waterfront Charter Amendment (Vote on The Pier), Carly Fiorina for President

Wednesday, July 15, 2015

Is the Pier approach really safe for those demolition trucks and equipment?


After being told repeatedly that the Pier approach was unsafe for pedestrians now the approach will be used to haul thousands of tons of debris as the inverted pyramid is torn down. There will also be a lot of construction equipment needed to complete the demolition process.

You may also remember that "safety" was one of the reasons given for shuttering the Pier over a year before any final decision was made.

It will be interesting to see what safety precautions Glasbrenner takes in terms of truck size and load size as the demolition process begins. Limitations on size and weight of demolition equipment could seriously affect the time to complete the demolition phase.

It is a real dilemma for the Kriseman administration. They want the inverted pyramid gone as soon as possible to help avoid a referendum and it is also in Glasbrenner's interest to get the job done as soon as possible.

Check out the Sonny Glasbrenner website for some stunning views of the Pier.

My guess is the Pier approach had a lot more life left in it than Foster, Kriseman or Connors wanted the public to know about, but then it would be a shame to see one of those shiny 12 wheeler dump trucks sitting on the bottom of the bay.

E-mail Doc at: mailto:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook and Twitter. See Doc's Photo Gallery at Bay Post Photos

Tuesday, July 14, 2015

City caught with its Pier Park permits down

Opinion by: E. Eugene Webb PhD
Coauthor of: So You Want Blog .
  
Just when it looked like the Pier issue was pretty much settled and I would have to search for something new and dumb to write about, Tampa Bay Times Staff writer Waveney Ann Moore put up an article: No clear answer on when Pier can come down.

And I was starting to worry about what to blog about.

It is starting to look like the Kriseman administration's dedicated leader of the charge to demolish the Inverted Pyramid has once again put his foot in his silver tongued mouth.

I was at the meeting when Karl Nurse asked Connors about the permitting, First Connors said yes they had all the permits, and then he said they didn't need an Army Corps of Engineers Permit to tear down the Inverted Pyramid since it was above the water.

Didn't sound right to me; given that the Pier sets right in front of the largest marina in Florida, the Vinoy basin and marina and the City's mooring field.

That makes all of the water around the Pier and the Pier head navigable water.

But everyone on Council was so anxious to get this deal done and behind them no one followed up.

Quoting from Waveney's article: "Last week, U.S. Army Corps of Engineers spokeswoman Nakeir Nobles told the Tampa Bay Times that since the Pier is over navigable waters, the agency must issue a demolition permit for the entire structure — the approach, or bridge, the pyramid and the area surrounding it. Further, she said, work cannot begin until an agreement concerning historic preservation is finalized. The tentative timing for that is this fall, she said."

For now they have pushed Tom Gibson, the City's Director of engineering, out in front to try to explain what's going on. Gibson, whose forte has never been explaining things to the press or the public, just seemed to further confuse the whole issue.

Gibson, in true engineering fashion, demonstrated why the City hires consultants as he blamed to whole mess on the consultant hired to get the permit.

Then there is the whole historic preservation agreement which the Corps says must be completed before demolition can begin. That could take months.

In addition, has anyone checked with the Army Corps of Engineers to see if they will need permits to moor those barges used to haul away debris?

By the way, has anybody checked with Glasbrenner to see what kind and how big the cranes will be and with the FAA to see if they have any issues?

How much longer is City Council going to sit on the dais and drink up everything Mike Connors tells them. They have been misled or lied to so many times I would think they would finally figure out that this is a means justifies the end game and the end game is to tear that Inverted Pyramid down.

With these kinds of shenanigans right out of the gate, it is hard to imagine what will go on in the Pier Park design meetings and what stories will be concocted to get Council to buy into what will be a "changing design".

Nothing better than this permit debacle, could make the case for the Waterfront Referendum and the absolute need to put control of the waterfront in the hands of the public.

Every time you turn over a rock in this project it becomes clearer you can't trust the administration, and City Council seems incapable or unwilling to act properly, ask the right questions and get the documentation to protect the City's most valuable asset.

E-mail Doc at mail to:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook. See Doc's Photo Gallery at Bay Post Photos.

Wednesday, July 8, 2015

The stampede to the new Pier

Opinion by: E. Eugene Webb, PhD
Coauthor of: So You Want to Blog

As expected, it looks like the Kriseman Administration is about to attempt yet another Hail Mary in the continuing saga of the new St. Pete Pier.

On Thursday's Council agenda is the new Pier Park design for approval, the construction manager contract for approval and the Pier demolition contract for approval.

None of these items has been seen by the public, there has been no formal presentation for public information or comment, the City's New Pier Web site has not been updated since May and my guess is Council will get final details as late as Kriseman and Connors think they can get away with.

What does the "in budget" Pier Park really look like?
Where are the renderings so the public and the Committee that so aptly recommended this design could compare reality with the BS they were sold?
Will the County issue the needed permits?
Will the State issue the needed permits? Not Just Connors saying so has the state seen the new design?
What about the bond issue? How much? When? Who?

Why the rush?

If it's so the Mayor can have Pier Park as a second term campaign bragging point, believe it when I say by the time Kriseman thinks about running for a second term the Pier will be the last thing he wants to talk about.

No, the rush is all about getting ahead of a potential referendum. Hold the defrocked Pier Park design details as long as possible, get the Pier demo started before the referendum so the outcome cannot affect the Pier which will lower turnout and improve the chance the referendum may fail.

Back City Council into a corner with a bunch of hyped up claims that if they don't move now, some great calamity may happen, like a referendum.

Somebody in the Kriseman administration needs to explain why they don't want the people to have a voice. And don't give me, or the public, the BS that they already had their chance. Not on this version of the design.

City Council must also consider they are being hustled into spending almost $50 million for something a majority of the people don't want.

There is no rush. Let's put the final design on the table and let everyone have some time to look it over and comment. Who knows? Maybe of couple of tweaks and everyone's view might change.

For now Mike Connors is going to back a truck up the Council dais and dump a load of crap backed up by his folksy rhetoric and thinly veiled threats if action is not taken now.

There is little honor and no shame in the Kriseman administration. They manipulated the Pier process and the Selection Committee and now they will try to manipulate the City Council.

Council should table this whole package, hold a couple of public comment sessions and give the public some time to weigh in.

E-mail Doc at: mailto:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook and Twitter. See Doc's Photo Gallery at Bay Post Photos
Contributor: Waterfront Charter Amendment (Vote on The Pier), Carly Fiorina for President

Wednesday, May 13, 2015

The Incredible Shrinking Pier

Opinion by: E. Eugene Webb PhD
Coauthor of: So You Want Blog .

It was somewhat amazing to watch at Thursday's St. Pete City Council meeting as Pier Park simply shrank right before the City Council's eyes and no one even mentioned: bait and switch, change of scope, what will it really look like or can we have a look at what the real renderings will look like.

The footprint had already shrunk by almost 25% or so to get some hope of permitting and those towering trees that looked like 30 foot Oaks, quietly shrunk to 30 foot native plants, make that palm trees.

The real issue here is City Council may have bought themselves a $33,000,000 pig in a poke. Forget the inverted pyramid, what will this thing really look like?

Here is a given.

The Kriseman administration will get a deal on Pier Park if Mike Connors has to unload the dirt for the event field from the truck himself with a shovel and a wheel barrow to make the budget.

Under no circumstances, at any cost, for any reason, no matter what, come hell or high water these negotiations with the Pier Park group cannot fail because the State Statute requires that if they do the City MUST negotiate with the second ranked and that is Destination Pier.

From the Kriseman administration's position that cannot happen!
 
This deal will be filled with enough holes to embarrass a sieve.

 The City will pony up "in kind" services, provide "staff support", agree to "finish" certain parts of the structure, "haul away debris at City cost or no cost for undefined "City Purposes", waive permitting costs on an on the list will go.

Pier Park could not be permitted and most likely not built within the budget as originally designed. As the wheeling and dealing begin in the design phase the real question is who is watching the chickens and the answer is the silver haired fox.

E-mail Doc at mail to:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook. See Doc's Photo Gallery at Bay Post Photos

Wednesday, April 8, 2015

Mike Connors should be removed from the St. Pete Pier Selection Committee


Opinion by: E. Eugene Webb PhD
Coauthor of: So You Want Blog .

The level of concern surrounding the St. Pete Pier Selection process continues to grow. So far Mayor Kriseman has not distanced himself from any of his hand picked Selection Committee Chairman's comments made during the last Selection Committee meeting.

His recent well crafted comments are merely a thin veil over the desired replacement of the inverted pyramid.

Process is an important factor in the selection of a new Pier design. Last time the process was hijacked by the artful, but I must admit I didn't expect this Pier selection process to be so openly hijacked by the Kriseman administration.

The Selection Committee must feel a bit estranged at this point.

It is becoming hard to take the Selection Committee process seriously since it appears that the Mayor has loaded the deck in favor of doing away with any semblance of the inverted pyramid.

With all of the Kriseman talk about being an open and inclusive process the reality has been less than the promise.

From his style to his attitude Connors can be extremely intimidating. It seems to me it will be all but impossible for the Selection Committee to function openly, fairly and effectively with Connors sitting the Chairman's seat.

Connors may use his colorful prose to try to talk his way out of the mess he created, but no one seriously following this train wreck will buy it. He is there to shill for the Mayor and shill he will.

Kriseman has a big decision to make. If he leaves Connors as Chairman of the Pier Selection Committee, and the Committee with Connor's urging ignores the public's preference ranking ALMA first, it would give the appearance that the Administration stacked the deck.

Obviously City Council can undo the Selection Committee's decision by simply not accepting the Committee's ranking, but that could lead to a restart of the whole Pier process and delay things for another year or so.

City Council could simply accept ALMA and let negotiations begin. One can rest assured if the Kriseman administration gets ALMA to the negotiation phase there will be a deal no matter how much it costs St. Petersburg.

Should the selection of ALMA become a reality, you can expect a significant public outcry. There is already one petition drive under way and it would seem likely an attempt would be made to put ALMA up for referendum consideration.

It is quite probable that a sufficient number of signatures could be obtained to put the issue on the ballot. The vote would not be as much about the Pier design as it would be about the process and a St. Pete Mayor failing to be true to his promises and failing to provide leadership based on the public's wishes.

That scenario could very likely lead St. Pete to its second one term strong Mayor.

E-mail Doc at mail to:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook. See Doc's Photo Gallery at Bay Post Photos

Sunday, March 29, 2015

Sunday March 29, 2015 The Inverted Pyramid – Is 125 years really all that bad?

By: Eugene Webb, PhD
Coauthor of: So You Want to Blog

During the final Pier Selection Committee ranking meeting, Mike Connors, in a now widely reported mini rant, went to great lengths in an attempt to make a case for a lack of technical, feasible and pragmatic value of the current inverted pyramid.

One of his statements seemed to stick with me more than the others. Loosely paraphrased he said, if we renovate the existing inverted pyramid and it lasts the projected 75 years it will been representing St. Petersburg for almost 125 years and that's not the image I think we want to project.

The Mayan pyramids, which were built starting nearly 3,000 years ago, are perhaps the greatest tourist attractions of Mexico and Central America.

There is general agreement the Egyptian Pyramids were constructed beginning in about 2500 BC which would make them about 4700 years old. The Egyptians seem to be quite proud of them.

I have been to the Mayan Pyramid at Chichen Itza, all the way to the top and down into tombs.

Very impressive.

Connors kind of hissed the remark out through his teeth like St. Petersburg would be some sort of scourge on the planet with a 125-year-old inverted pyramid as its symbol.

Ok..Ok I get it, it's upside down. I sometimes think it's the whole upside down thing that really freaks some people out. As Spoc would say, "it's not logical."

Maybe if it were right side up it wouldn't bother people so much.

But looking at it logically, neither Egyptians nor the Mayans have made a head long rush to tear down their pyramids. Maybe we should not be quite so anxious to tear ours down either.

I can imagine a couple with their kids looking out over the bay 75 years from now standing on the Pier observation deck and saying, "You know this thing is almost 125 years old it's been here all this time watching over its City. It's pretty neat."

The baby boomers have come and are in the process of going, the millennials will come and go and over the next 75 years several more defined generations will also come and go.

The point is generations come and go but what anchors us all and ties us together are the things in this world that are consistent like pyramids be they right-side up or upside down.

E-mail Doc at: mailto:dr.gwebb@yahoo.com or send me a Facebook (Gene Webb) Friend request. Please comment below, and be sure to share on Facebook and Twitter. See Doc's Photo Gallery at Bay Post Photos